CAPABILITY DIRECTORY

Start with the field problem and system boundary.

Choose what must be diagnosed, changed, commissioned or recovered. Each scope then shows evidence to collect, conditions that stop work, verification gates and as-left handover expected for Korean field coordination.

FIND THE RIGHT SCOPE

Filter by problem and system

Search is applied only when you press Enter or Search, so the list does not jump while you are still typing.

Need more than one scope?

Keep system boundaries separate, then name interfaces: source and load, controller and I/O, network and field response, safety and production release. Do not merge evidence owners or acceptance gates simply because one outage covers several systems.